FAQs
More FAQs- When will I be able to walk on my floors?
- Is drying and curing the same thing?
- What is post construction cleaning?
Hard-surface floors treated with an acrylic finish can be lightly walked on within an hour after the last coat was applied. We recommend allowing the floor to dry for 24 hours before allowing heavy traffic on it.
No. Drying means that the surface layer is no longer wet or damp to the touch. Curing, on the other hand, means that acrylic has reached its maximum hardness thereby providing the necessary protection of your flooring.
Construction clean-up is a service provided to brand new buildings or buildings that are being remodeled. While building contractors will do a general clean-up of construction debris, a detailed clean is required to remove all the dust and dirt left behind.