FAQs
More FAQs- How long will it take to have my hard floors coated with urethane?
- How long will it take to have my floors coated with acrylic?
- Does urethane finish yellow?
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. The coating application can be accomplished at a rate of 750 square feet per hour with a two-person crew.
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. When applying an acrylic finish, stripping of the old finish is usually necessary. When that’s the case, finish removal plus the application of 3 coats of finish requires 1 hour for every 150 square feet of flooring. Generally, 3 coats of finish are required to achieve the desired effect. If a floor does not require stripping, it can generally be shower scrubbed which is a procedure used for preparing a floor for receiving a new layer of finish. Once that has taken place, a floor can be recoated at anywhere from 4,000 to 6,000 square feet per hour.
Our urethane finish is UV resistant and will not yellow.